By Carl Morris, Carpentry Tutor · Last updated: November 2026
First fix carpentry generally covers the timber framework and concealed elements installed before the main wall and ceiling finishes, such as stud walls, floor joists, roof timbers and many door linings. Second fix is the visible finishing work, such as hanging doors, door furniture, fitting skirting and architrave and boxing-in. Some items vary by contractor and project, so the distinction is a useful guide rather than a rigid rule. Most domestic carpenters do both, and learning both makes you far more employable.
The terms describe the stage of a build. First fix generally comes before plastering or other finishes; second fix follows afterwards. Both demand accuracy, but the emphasis changes from forming the structure to achieving a neat visible finish.
| First fix | Second fix | |
|---|---|---|
| When | Before plastering | After plastering |
| Typical jobs | Stud walls, joists, roof timbers, door linings | Doors, skirting, architrave, boxing-in, flooring |
| What matters most | Strength, accuracy, plumb and level | Finish quality and neat joints |
| Visible when finished? | Mostly hidden | Fully visible |
The hidden framework that everything else is fixed to:
First fix needs accuracy and strength more than a perfect finish, because most of it ends up hidden. But mistakes here show up later: a door lining that’s out of plumb means a door that never hangs right.
The visible finishing work after plastering:
Second fix is all about finish: tight mitres, clean cuts and no gaps. It’s the work customers notice.
For domestic and property maintenance work, it helps to understand both. A room renovation may involve building a non-loadbearing stud partition (first fix), then hanging the door and fitting architrave and skirting after plastering (second fix). Being able to do both means you can take the whole job.
Our 5-day and Saturday carpentry courses cover studwork, door linings and hanging doors, and skirting and architrave. The 9-day course adds rehanging doors in old frames, laminate flooring, boxing-in, a meter box cabinet and repairs. These courses do not claim to qualify you for structural roof or floor design and installation.
Imagine fitting out a spare room. First, a stud partition and correctly positioned door lining are set out. Once the boards and plastering are complete, the internal door is hung and the skirting, architrave and handles are fitted. On a training visit, ask to see learners practising both stages and how their work is checked for level, square and finish.
Fitting the door lining is first fix; hanging the door itself is second fix.
Yes, though it’s often treated as a specialist trade. See How long does it take to learn kitchen fitting?
Yes. First fix is running cables or pipes before plastering; second fix is fitting sockets, switches, taps and sanitaryware afterwards.